Braco Norte IV
Description: The Braço Norte IV Plant is a small run of river hydro project.
Braço Norte IV generates 14MW of electricity for the Brazilian Integrated Grid. The energy is fed in at the nearby Matupá sub-station which assures far greater stability for local energy supplies, essential for sustainable growth in this remote region. The project is on track to reduce carbon dioxide emissions in the area by 319 thousand tonnes during the seven years that the project runs from August 2007.
| Project Type: |
Hydroelectric Power |
| Location: |
County of Novo Mundo, Mato Grosso, Brazil, Brazil |
| Quantity: |
319,149 tonnes CO2e total |
| Accounting period: |
2007 to 2014 |
| Operator: |
Guarantã Energética Ltda Estrada Francisco Paes de Barros S/N, bairro Ribeirão da Lipa,
Cuiabá,
Mato Grosso,
78.040-570 |
| Certification: |
Clean Development Mechanism |
| Supported by: |
Clear, the Carbon Offset Company (UK)
|
| Entry created: |
6th June 2010 |
| Last updated: |
31st August 2010 |
| |
|
|
|
|
More information - Secondary link
(opens external site)
|
Attached documents:
|
All hydro projects in Brazil »
|