Dora II 9.5 MWe Geothermal Energy Project

Description: The Project includes the construction of a plant for electric power generation with an installed capacity of 9.5 MWe by using geothermal heat brought to the surface through geothermal generation wells. The annual electricity generation is estimated to be 70,000 MWh.


Project Type: Geothermal Power
Location: Salavatlı geothermal area, 26 km away from the city of Aydin, in west Anatolia, in the Eagean region., Turkey
Quantity: 41,000 tonnes CO2e per year
Accounting period: -
Operator: -
Certification: Voluntary Carbon Standard
Gold Standard
Supported by: South Pole Carbon Asset Managment Ltd. (Switzerland)
Entry created: 21st September 2010
Last updated: 5th October 2010
   
Loading map...
More information (opens external site)

All geotherm projects in Turkey »

This site is managed by The Ecosystem Marketplace