EECOPALSA biogas capture

Description: Capture the methane emitted by the open lagoons at the PALCASA Palm Oil Mill and convert into grid connected renewable electricity.


Project Type: Industrial Methane
Location: El Progreso, Yoro, Honduras
Quantity: 193,906 tonnes CO2e total
Accounting period: From 2006 for 7 years
Operator: Energía Ecológica de Palcasa, S.A.
Certification: Clean Development Mechanism
Supported by: ZeroGHG (Canada)
Entry created: 17th January 2008
Last updated: 17th January 2008
   
Loading map...
More information (opens external site)

All methane projects in Honduras »

This site is managed by The Ecosystem Marketplace