| Project name: |
ERGA Geothermal Stations |
| Summary: |
Two geothermal stations owned by ERGA S.p.A: Piancastagnaio 4, a 20 MW geothermal station that entered service on November 21, 1991 and Cornia 2, a 20 MW geothermal station that entered service on February 16, 1994. Both supply energy to the Italian electrical system which is predominately fossil based. |
| Location: |
Piancastagnaio and 1 other location, Italy |
| Type: |
Geothermal Power |
| Quantity: |
143,965 tons CO2e per year |
| Offset period: |
From 1991 |
| Operator: |
Enel GreenPower Piazza Leopolda, 1
56044 Larderello |
| Standard: |
- |
|