Jinshaxia 70MW Hydropower Project

Description: The proposed project is a low-weir diversion-type run-of-river hydropower project with an installed capacity of 70 MW. The primary objective of the proposed project is to generate electricity to meet the ever-increasing demand in the Qinghai Provincial Grid and Northwest China Grid (NWCG). According to the Planning Report of Utilizing Water Resource in Datong River Basin1, the proposed project is expected to supply 249.51 GWh electricity annually before the year of 2020 and 149.71 GWh after the year of 2020 to NWCG through the Qinghai Provincial Grid. Electricity generated by the proposed project will displace part of the electricity generated by the NWCG which is dominated by fuel-fired power plants, and thus greenhouse gas (GHG) emission reductions could be achieved.


Project Type: -
Location: China
Quantity: 211,410 tonnes CO2e per year
Accounting period: -
Operator: -
Standard: -
Supported by: Tricorona (Sweden)
Entry created: 22nd January 2010
Last updated: 22nd January 2010
   
More information (opens external site)