| Project name: |
La Esperanza Hydroelectric Project |
| Summary: |
A small containment run-of-river hydroelectric project in the Intibuca region of Honduras. Total installed capacity is 12.8 MW. |
| Location: |
La Esperanza, Intibuca, Honduras |
| Type: |
Hydroelectric Power |
| Quantity: |
37,031 tons CO2e per year |
| Offset period: |
From 2005 for 21 years |
| Operator: |
Consorcio de Inversiones S.A. Apartado Postal #53
La Esperanza
Intibuca |
| Certification: |
Kyoto Clean Development Mechanism |