| Project name: |
Mulan County Wind |
| Summary: |
20 wind turbines situated on top of the only hills in Mulan County, making the most of the strong regional wind speeds (measured as 7.8 m/s at 25m). Thel wind farm generates approximately 25 GWh of electricity each year. |
| Location: |
Mulan County, Heilongjiang, China |
| Type: |
Wind Power |
| Quantity: |
28,000 tons CO2e per year |
| Offset period: |
From 2004 |
| Operator: |
Carbon Resource Management Suite 1203
Air China Plaza
No 36 Xiaoyun Road
Chaoyang District
Beijing 100027 |
| Standard: |
Voluntary Carbon Standard |