Ningxia Yinyi Hongsipu Wind
Produce 49.50 MW that will be distributed to the Ningxia Power Grid. The project will be the first wind-farm in the area using locally produced generators. It will be comprised of 33 wind turbines each with a capacity of 1,500kW.
More about this project...
| Project Type: |
Wind Power |
| Location: |
Wuzhong City, Hongsipu Development Zone, Ningxia Hui Autonomous Region, China |
| Quantity: |
97,745 tons CO2e per year |
| Offset period: |
2007 to 2013 |
| Operator: |
Ningixia Yinyi Wind Power Generation Co., Ltd No. 620 of Eastern Road of Yellow River
Yinchuan
Ningxia 750002 |
| Standard: |
- |
| Project checks: |
    |
| Supported by: |
Enpalo (USA - CO)
|
|
|