|
||||||||||||||||||||||||||
Pitak Palm WWTDescription: The proposed project entails the installation of a Completely Stirred Tank Reactor (CSTR) and an Upflow Anaerobic Sludge Blanket technology (UASB) biogas reactor for treatment of waste water and power generation at an existing palm oil mill in Ampher Sikao, located in the Trang Province in Southern Thailand.
|
||||||||||||||||||||||||||
| Carbon Catalog © 2012 | About | Contact | For Providers | Subscribe | Download Data | Widget | ||||||||||||||||||||||||||