Renjiaba 12.6 MW Hydro

Description: The purpose of the project activity is to generate electricity using hydro potential available in the upstream of Fujiang River, Sichuan Province, P. R. China. The total installed capacity of the proposed project is 12.6 MW (6.3 MW * 2). With a rated water head of 33.7 m and rated flux of 45.0 m3/s, the project is expected to generate 81400 MWh of electricity in a year, and 77458 MWh will be exported to the grid. The generated electricity will be exported to the Central China Power Grid (CCPG), a state government owned power utility company. The estimated of emission reduction is 73089 tCO2e. The project involves construction of a diversion structure, diversion tunnel, penstocks, powerhouse, power evacuation system, and tailrace canal. The project is a run of the river scheme, where the water from the project will be led back to the river through tailrace canal.


Project Type: -
Location: China
Quantity: 73,089 tonnes CO2e per year
Accounting period: -
Operator: -
Standard: -
Supported by: Tricorona (Sweden)
Entry created: 8th February 2010
Last updated: 8th February 2010
   
More information (opens external site)