Description: The purpose of the project activity is to generate electricity using hydro potential available in the
upstream of Fujiang River, Sichuan Province, P. R. China. The total installed capacity of the proposed
project is 12.6 MW (6.3 MW * 2). With a rated water head of 33.7 m and rated flux of 45.0 m3/s, the
project is expected to generate 81400 MWh of electricity in a year, and 77458 MWh will be exported to
the grid. The generated electricity will be exported to the Central China Power Grid (CCPG), a state
government owned power utility company. The estimated of emission reduction is 73089 tCO2e.
The project involves construction of a diversion structure, diversion tunnel, penstocks, powerhouse,
power evacuation system, and tailrace canal. The project is a run of the river scheme, where the water
from the project will be led back to the river through tailrace canal.
| Project Type: |
- |
| Location: |
China |
| Quantity: |
73,089 tonnes CO2e per year |
| Accounting period: |
- |
| Operator: |
- |
| Standard: |
- |
| Supported by: |
Tricorona (Sweden)
|
| Entry created: |
8th February 2010 |
| Last updated: |
8th February 2010 |
| |
|
|
|
|