Renjiaba Small Hydro
Description: The purpose of the project activity is to generate electricity using hydro potential available in the
upstream of Fujiang River, Sichuan Province, P. R. China. The project is a run of the river scheme, where the water from the project will be led back to the river through a tailrace canal. The total installed capacity of the proposed project is 12.6 MW. The project is expected to generate 81400 MWh of electricity in a year, and 77458 MWh will be exported to the grid. The generated electricity will be exported to the Central China Power Grid (CCPG), a state government owned power utility company. The estimated emission reduction is 73089 tCO2e.
| Project Type: |
Hydroelectric Power |
| Location: |
Upstream of Fujiang River, Sichuan Province, P. R. China, China |
| Quantity: |
511,623 tonnes CO2e total |
| Accounting period: |
2008 to 2014 |
| Operator: |
Pingwu Chuanjiang Hydropower Development Co. Ltd. |
| Certification: |
Clean Development Mechanism |
| Supported by: |
Climate Action (China)
Tricorona (Sweden)
|
| Entry created: |
8th February 2010 |
| Last updated: |
23rd November 2010 |
| |
|
|
|
|
More information
(opens external site)
|
All hydro projects in China »
|