| Project name: |
Summersville Hydro Plant |
| Summary: |
Summersville is home to West Virginia’s largest lake and is a destination spot for nature lovers and outdoor enthusiasts. The Summersville Dam on the Gualey River releases 2,500 cubic feet of water per second each time it is released, generating clean renewable energy for Southern West Virginia. |
| Location: |
Summersville, West Virginia, USA |
| Type: |
Hydroelectric Power |
| Quantity: |
- |
| Offset period: |
From 2001 |
| Operator: |
American Electric Power 1 Riverside Plaza
Columbus
Ohio 43215-2372 |
| Standard: |
- |
|