Description: The project is placed at the north of the Espirito Santo state in Brazil. The purpose of this project is to improve the local supply of electricity based on a clean and a renewable energy source by increasing the energy generation of an existing hydro power plant. The project comprises the installation of a new Kaplan turbine with a nominal capacity of 49.5 MW. This fourth generation unit will optimize the water flow that would be otherwise inefficiently released at the reservoir dam. The project activity uses the existing hydro power scheme and the existing electric infrastructure to increase the amount of generated energy.


Project Type: Hydroelectric Power
Location: Mascarenhas, Espirito Santo state, Brazil
Quantity: 353,262 tonnes CO2e total
Accounting period: 2007 to 2014
Operator: Energest
Certification: Clean Development Mechanism
Voluntary Carbon Standard
Supported by: ZEROCO2 (Canada)
Entry created: 29th January 2010
Last updated: 15th August 2010
   
Loading map...
More information - Secondary link (opens external site)

All hydro projects in Brazil »

This site is managed by The Ecosystem Marketplace