Waste gases utilisation for Combined Cycle Power Plant in Handan Iron & Steel Group Co., Ltd
Description: The objective of project activity is to capture waste gases from the steel-making process and to utilize these gases in a new combined cycle power plant (CCPP) specifically designed and installed for this purpose.
The project activity consists
of setting up and operation of a 2×49 MW Combined Cycle Power Plant (CCPP) and auxiliary installation.
The project activity adopts CCPP technology to generate electricity through combustion of waste excess
blast furnace gas (BFG) and coke oven gas (COG), which were previously flared and vented in to the atmosphere.
| Project Type: |
Fuel Substitution |
| Location: |
Handan Iron & Steel Group Co., Ltd near Handan City, Hebei Province, People’s Republic of China, China |
| Quantity: |
665,545 tonnes CO2e per year |
| Accounting period: |
- |
| Operator: |
Handan Iron & Steel Group Co
Hebei Province |
| Standard: |
- |
| Was supported by: |
Tricorona (Sweden)
|
| Entry created: |
22nd January 2010 |
| Last updated: |
20th June 2010 |
| |
|
|
|
|
More information
(opens external site)
|
All fuels projects in China »
|