Yanzhou Small Hydro

Description: China Yanzhou Hydropower Expanded Project is designed to generate power so as to make full use of ample hydro resources. It is located in the downstream of the river and at the left bank of the dam. The proposed project has the installed capacity of 20MW (2×10MW) with annual utilization time of 3233 hours. When the project is completed, the net electricity to the grid will be 61,420MWh. The electricity will be transmitted to Guanxin Substation through an 110kV line, and then to the Central China Power Grid.


Project Type: Hydroelectric Power
Location: Qiaojiahe Town, Li County, Changde City, Hunan Province, China
Quantity: 419,209 tonnes CO2e total
Accounting period: 2008 to 2015
Operator: Qiaojia River Power Co., Ltd, Li County
Certification: Clean Development Mechanism
Supported by: Tricorona (Sweden)
Entry created: 26th November 2010
Last updated: 30th November 2010
   
Loading map...
More information (opens external site)

All hydro projects in China »

This site is managed by The Ecosystem Marketplace