Yanzhou Small Hydro
Description: China Yanzhou Hydropower Expanded Project is designed to generate power so as to make full use of ample hydro resources. It is located in the downstream of the river and at the left bank of the dam. The proposed project has the installed capacity of 20MW (2×10MW) with annual utilization time of 3233 hours. When the project is completed, the net electricity to the grid will be 61,420MWh. The electricity will be transmitted to Guanxin Substation through an 110kV line, and then to the Central China Power Grid.
| Project Type: |
Hydroelectric Power |
| Location: |
Qiaojiahe Town, Li County, Changde City, Hunan Province, China |
| Quantity: |
419,209 tonnes CO2e total |
| Accounting period: |
2008 to 2015 |
| Operator: |
Qiaojia River Power Co., Ltd, Li County |
| Certification: |
Clean Development Mechanism |
| Supported by: |
Tricorona (Sweden)
|
| Entry created: |
26th November 2010 |
| Last updated: |
30th November 2010 |
| |
|
|
|
|
More information
(opens external site)
|
All hydro projects in China »
|