Description: Yaylabel Hydro Power Plant will generate power using the water from the spring of the Kartoz Stream. The project will involve the construction of a run-off river station at the Kartoz Stream with an installed capacity of 5.2 MW and is estimated to produce 20.40 GW/h annually.
| Project Type: |
Hydroelectric Power |
| Location: |
Koprucay River, Isparta Province, Turkey |
| Quantity: |
110,770 tonnes CO2e total |
| Accounting period: |
2009 to 2019 |
| Operator: |
- |
| Standard: |
Voluntary Carbon Standard |
| Supported by: |
SerCarbon (Turkey)
|
| Entry created: |
12th July 2010 |